REMOTELY OPERATED
UNDERWATER INSTALLATION SYSTEM

Underwater geomembrane installation

A remotely operated system for installing SIBELON™ geomembrane liners on submerged infrastructure without draining the structure or interrupting operations.

Nuvisa underwater geomembrane installation system
Developed forCarpi Tech
DeviceALBI 1
Installation rateUp to 3,000 m² per day
The challenge

Install underwater. Keep infrastructure operating.

Installing large geomembrane liners on submerged hydraulic structures requires precise positioning and secure anchoring while water continues to flow and the infrastructure remains operational.

01

No dewatering

Eliminate the need to drain dams, canals and reservoirs before installation.

02

Continuous operation

Maintain hydropower generation and essential water operations throughout the work.

03

Large-scale positioning

Precisely deploy extensive geomembrane liners across submerged surfaces.

04

Current resistance

Secure reliable anchoring in underwater currents of up to 1 m/s.

05

Installation quality

Deliver consistent placement and long-term waterproof performance underwater.

06

Minimal disruption

Reduce shutdowns, project downtime and environmental disturbance.

Our solution

A complete installation system

Nuvisa combined remote operation, controlled liner deployment, intelligent positioning and specialized anchoring into one integrated workflow for submerged infrastructure.

01

Remote operation

02

Precision positioning

Robotic underwater liner installation
03

Controlled deployment

04

Secure anchoring

Prepare

Configure the system and liner for the submerged structure.

Deploy

Introduce the geomembrane into the operational water environment.

Position

Guide the liner precisely across large underwater surfaces.

Anchor

Secure the installation against flow and site conditions.

Verify

Confirm consistent placement and installation quality.

Technology in motion

Underwater installation in operation

See the remotely operated installation process and equipment working below the surface.

Operational value

Rehabilitation without shutting down

01

Eliminates costly dewatering and infrastructure shutdowns.

02

Maintains hydropower and water operations during installation.

03

Supports installation rates of up to 3,000 m² per day.

04

Delivers precise, reliable liner placement across submerged surfaces.

05

Extends infrastructure service life with long-term waterproof protection.